Specification review
Standard, drawing, sample or photo. We list thread, length, grade, material, finish, packing and quantity in writing before quoting.
Quality & process
Fasteners fail at the interface: thread, grade, coating, tolerance. The process is built to confirm those four things before production — and to check them before the carton is sealed.
01 — Quality
No quality claim survives a mismatched thread. Our route is deliberately unglamorous: confirm the specification, check what arrives, inspect what leaves.
How an order runs
Production, warehouse sales, inspection and export paperwork stay under one specification from the first email to the loading bay.
Standard, drawing, sample or photo. We list thread, length, grade, material, finish, packing and quantity in writing before quoting.
Incoming steel and coating are checked against the agreed specification. If a substitution is proposed, it is agreed before production — not after.
Forming, threading and surface finishing run against the approved specification. First-article parts are checked before the run continues.
Dimensions, thread fit, surface condition and quantity are checked against the approved list. Findings are recorded against the batch.
Cartons are labeled to the agreed list; pallets and wooden cases are built for the shipping method. Documents are prepared for your forwarder.
Quality
Different markets ask for different paperwork. Tell us what your customs, engineer or QA team needs — material certificates, dimensional reports, third-party inspection or photographs — and we will confirm what can be provided for the order.
What we do not do
We do not publish certification claims that are not tied to a specific order, and we do not quote a grade or coating we cannot confirm. If a requirement is outside our capability, we will say so.
Send your drawing or specQuality & process
A drawing, a standard reference or a sample photo is enough to start the review.