Ordering fasteners from China: a buyer’s checklist

A practical checklist for a first order: what to put in the specification, what to ask for before production, and how to avoid the usual surprises at the port.

Fastener production floor at Yiquan in Yongnian

A fastener order fails in predictable ways: the thread is right but the coating is wrong, the coating is right but the packing will not survive the container, or the price was agreed against a different quantity. None of these are exotic problems. They are specification problems, and most can be closed before the first pallet is built.

Put the specification in writing

A drawing is better than a description, and a sample is better than both. At minimum, the written specification should cover:

  • standard or drawing number, including the edition if it matters;
  • nominal diameter, pitch and length;
  • property class or grade;
  • material and surface finish, including coating thickness if specified;
  • head marking and any marking requirements;
  • dimensional tolerances that are tighter than the standard;
  • packing format, label content and pallet dimensions.

If a field is unclear, mark it as “to be confirmed” rather than leaving it out. A supplier who guesses will guess differently from your engineer.

Agree the standard equivalence

DIN, ISO and GB/T references overlap but are not identical. A DIN 933 bolt and a GB/T 5783 bolt are close equivalents, yet the head dimensions or thread tolerance can differ. If your drawing says DIN and the factory quotes GB/T, ask for the comparison and confirm the critical dimensions — not just the name of the standard.

Ask what will be inspected

“Quality control” is too broad to be useful. Ask instead:

  • Which dimensions are checked, and with what instrument?
  • Is the thread checked with a go/no-go gauge?
  • How is the coating thickness verified?
  • Is a first-article part checked before the run?
  • What happens if the batch fails?

The answers tell you more than a certificate on a website. If third-party inspection is required, agree who arranges it and who pays before production.

Plan the packing before the price

Cartons, pallets and wooden cases are not interchangeable. A carton that is fine for air freight can collapse in a container. Ask for the carton grade, the maximum weight per carton, the pallet footprint and whether the pallet is heat-treated. If the parts feed a production line, agree the label format and the quantity per box — a line stop is more expensive than a slightly better carton.

Choose the shipping term deliberately

FOB is the most common starting point for a first order because your forwarder keeps control of the ocean leg. EXW can look cheaper, but you carry the export clearance and loading. CIF is simple, but the freight is bundled into the price and harder to compare.

Whichever term you choose, confirm what is included: export documentation, origin certificate, insurance, and who handles the destination charges.

Keep a record of the approved specification

The second order is where quality usually slips — not because the factory is careless, but because the specification lives in an email thread. Keep one approved document per part, with the sample photo, drawing, packing list and inspection notes attached. Send it with every repeat order.

That is also how we work: the specification agreed before production becomes the reference for inspection and packing. If you are starting a new part, send the drawing and we will confirm the details before quoting. For standard references, the standards guide is a useful starting point.

Questions buyers ask

Technical library

What should a fastener inquiry include?

The standard or drawing, nominal diameter and length, property class, material, surface finish, quantity and destination. A photo or sample of the existing part helps confirm the details that are hard to describe.

Should I ask for a sample before a bulk order?

For a new part or a new supplier, yes. A sample confirms thread, finish, head marking and packing, and gives both sides something concrete to approve before production.

Which Incoterm is best for a first order?

FOB is common because it keeps control of freight with your forwarder. EXW can look cheaper but leaves export clearance and loading to you. CIF is convenient, though the freight cost is less transparent.

Related reading

Ordering

Have a drawing? Send it.

Tell us the standard, material, finish and quantity. We will confirm the specification before quoting — and tell you plainly if something does not fit.